[CCMC 13452-R] CCMC Canadian code compliance evaluation
From: National Research Council Canada

CCMC number: | 13452-R |
Status: | Active |
Issue date: | 2012-07-18 |
Modified date: | 2022-12-01 |
Evaluation holder: | SUPERSEAL Basement Systems Ltd.
PO Box 61646 Brookswood RPO |
Product name: | SUPERPRO |
Compliance: | NBC 2015 |
Criteria: |
|
In most jurisdictions this document is sufficient evidence for approval by Canadian authorities.
Learn more about CCMC recognition Look for the trusted CCMC mark on products to verify compliance.Compliance opinion
It is the opinion of the Canadian Construction Materials Centre that the evaluated product, when used as a cold liquid-applied polymerenhanced asphalt for waterproofing below grade foundation walls (concrete or masonry block) in accordance with the conditions and limitations stated in this evaluation, complies with the following code:
National Building Code of Canada 2015
ID | Code provision | Solution type |
---|---|---|
09-13-03-01-00-0-00 | 9.13.3.1.(1) Where hydrostatic pressure occurs, water ... | Acceptable |
09-13-03-02-00-0-00 | 9.13.3.2.(1) Materials installed to provide required ... | Acceptable |
09-13-03-04-00-0-00 | 9.13.3.4.(1) Unless otherwise stated in this Subsecti ... | Alternative |
9.13.3.2.(2) +++ Waterproofing Materials | Alternative |
The above opinion(s) is/are based on the evaluation by the CCMC of technical evidence provided by the evaluation holder, and is bound by the stated conditions and limitations. For the benefit of the user, a summary of the technical information that forms the basis of this evaluation has been included.
Product information
Product name
SUPERPRO
Product description
The product is a liquid-applied polymer-enhanced asphalt that is applied with an airless spray to the exterior of foundation walls (concrete or masonry block) to create a 1-mm-thick waterproof membrane.
Manufacturing plant
This evaluation is valid only for products produced at the following plant:
Product name | Manufacturing plant |
---|---|
Surrey, BC, CA | |
SUPERPRO | Product evaluated by the CCMC |
Product evaluated by the CCMC Indicates that the product from this manufacturing facility has been evaluated by the CCMC
Conditions and limitations
The CCMC’s compliance opinion is bound by this product being used in accordance with the conditions and limitations set out below.
- The use of the product has been evaluated for applications falling under the scope of Part 9, Housing and Small Buildings, of Division B of the NBC 2015 for foundation walls at a depth of up to 3 m. The foundation walls must meet the structural requirements of the NBC 2015.
- The poured in place concrete must be cured prior to the application of the product.
- The maximum hydrostatic pressure that the membrane can sustain is 48 kPa for five days.
- Unit masonry or poured-in-place concrete walls must meet the surface preparation requirements of Article 9.13.3.3., Preparation of Surface, of Division B of the NBC 2015.
- The chemicals (Part A and B of the waterproofing system) must be stored on-site as per the manufacturer’s recommendations.
- The thickness of the membrane installed throughout the foundation wall must meet the minimum thickness of 1-mm- (40-mils-) thick (dry film) for which the product has been evaluated.
-
While the waterproofing continuity of the membrane to other parts of the wall (e.g., slabs, footing) is beyond the scope of this Evaluation Report, the installer must follow engineer-approved solutions to provide the waterproofing continuity.
-
Following its application, the entire membrane must be protected from exposure to ultraviolet (UV) radiation within two weeks of its application and in accordance with the manufacturer’s additional recommendations.
- The membrane application must stop at ground level. The exposed above-grade portion of the membrane after soil settling must be protected from UV radiation and mechanical impact with additional backfill that would be graded away from the foundation.
- The use of the product is limited to installation over foundation walls facing normal soil conditions. When used in soils containing high levels of organic matter, chemicals and microbiological activity, the manufacturer must be consulted to determine suitability.
- Prior to backfilling, the following conditions and limitations must be followed:
- The membrane must be first inspected to detect any defects (e.g., holes, tears, bubbles) and be repaired in accordance with the manufacturer’s instructions.
- The membrane must be covered with a protection board which may consist of a semi-rigid or rigid board with a smooth surface facing the membrane (e.g., mineral fibre boards, EPS/XPS boards or equivalent). The protection boards must not be installed using fasteners in order to avoid penetrations through the membrane. See the manufacturer’s recommendations regarding the use of adhesive and tape to secure the protection boards. Clean sand backfill can be used as an alternative solution to protection boards.
- The foundation wall must be backfilled in accordance with the requirements of Subsection 9.12.3., Backfill, of Division B of the NBC 2015.
- The product must be applied by qualified installers in accordance with the manufacturer’s installation instructions using their recommended tools.
- The product must be identified with the phrase “CCMC 13452-R.”
Technical information
This evaluation is based on demonstrated conformance with the following criteria:
Criteria number | Criteria name |
---|---|
CCMC-TG-071416.01-15 | CCMC Technical Guide for Liquid-Applied Membrane for Waterproofing Concrete Foundation Wall |
The Report Holder has submitted technical documentation for the CCMC’s evaluation. Testing was conducted at laboratories recognized by the CCMC. The corresponding technical evidence for this product is summarized below.
Material requirements
Property | Unit | Requirement | Result |
---|---|---|---|
Dry film thickness | mm | ± 10% of manufacturer’s specified value | 1.02 |
Hardness | – | Report value | 80 |
Water vapour permeance | ng/Pa·s·m2 | Report value | 55.1 |
Sag flow | mm | No sagging | 0Table footnote (1) |
Pinholing | – | ≤ 1 pinhole | No pinholing |
Tensile strength | MPa | Report value | 0.7 |
Elastic recovery | % | Report value | 73 |
Performance requirements
Property | Unit | Requirement | Result |
---|---|---|---|
Watertightness after heat aging | – | No leakage | No leakage |
Watertightness after chemical aging | – | No leakage | No leakage |
Watertightness after UV exposure | – | No leakage | No leakage |
Crack bridging resistance after water immersion | – | No visible cracking, blistering, peeling or other visible defects | No defects |
Crack bridging resistance after heat aging | – | No visible cracking, blistering, peeling or other visible defects | No defects |
Crack bridging resistance after UV exposure | – | No visible cracking, blistering, peeling or other visible defects | No defects |
Peel adhesionTable footnote (1) – initial | N/m | ≥ 175 | 1 401 |
Peel adhesion after water immersion | N/m | ≥ 90% of original | 1 488 (106.2%) |
Peel adhesion after heat aging | N/m | ≥ 90% of original | 1 488 (106.2%) |
Peel adhesion after UV exposure | N/m | ≥ 90% of original | 1 488 (106.2%) |
Tensile strength after heat aging | MPa | ≥ 90% of original | 0.7 (100%) |
Tensile strength after chemical aging | MPa | ≥ 90% of original | 0.7 (100%) |
Tensile strength after UV exposure | MPa | ≥ 90% of original | 0.7 (100%) |
Elastic recovery after heat aging | % | ≥ 90% of original | 73 (100%) |
Elastic recovery after chemical aging | % | ≥ 90% of original | 73 (100%) |
Elastic recovery after UV exposure | % | ≥ 90% of original | 73 (100%) |
Low temperature flexibility | – | No cracking | No cracking |
Other technical evidence
Additional performance data requested by the report holder
Time after spraying of membrane | Peel adhesion to concrete (N/m) [lb./in.] |
---|---|
4 days | 1 476 [8.43] |
7 days | 2 415 [13.79] |
28 days | 2 569 [14.1] |
Administrative information
Use of Canadian Construction Materials Centre (CCMC) assessments
This assessment must be read in the context of the entire CCMC Registry of Product Assessments, any applicable building code or by-law requirements, and/or any other regulatory requirements (for example, the Canada Consumer Product Safety Act, the Canadian Environmental Protection Act, etc.).
It is the responsibility of the user to confirm that the assessment they are using is current and has not been withdrawn or superseded by a later version on the CCMC Registry of Product Assessments.
Disclaimer
The National Research Council of Canada (NRC) has evaluated only the characteristics of the specific product described herein. The information and opinions in this evaluation are directed to those who have the appropriate degree of experience to use and apply its contents (such as authorities having jurisdiction, design professionals and specifiers). This evaluation is valid when the product is used as part of permitted construction, respecting all conditions and limitations stated in the evaluation, and in accordance with applicable building codes and by-laws.
This evaluation is provided without representation, warranty or guarantee of any kind, expressed or implied, and the NRC provides no endorsement for any evaluated product. The NRC accepts no responsibility whatsoever arising in any way from any and all use of or reliance on the information contained herein or the use of any evaluated product. The NRC is not undertaking to render professional or other services on behalf of any person or entity nor to perform any duty owed by any person or entity to another person or entity.
Language
Une version française de ce document est disponible.
In the case of any discrepancy between the English and French version of this document, the English version shall prevail.
Copyright
© His Majesty the King in Right of Canada, as represented by the National Research Council of Canada, 2023
All rights reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means, electronic, mechanical, photocopying, recording or otherwise, without the prior written permission of the CCMC.